Quittal vs manual grant reporting
Stop hand-typing your way through every grant report.
Manual reporting is the silent tax on every grant — paid in evenings, weekends and missed deadlines. Quittal does the busywork; you keep the judgement.
- Receipts extracted automatically — no typing
- Approvals captured in-line, not over email
- Narrative drafted from your real evidence
- Submit-ready pack assembled in one click
14-day free trial · Card required · Built in Australia.
Quittal vs manual reporting, side by side
An honest, feature-by-feature look.
| Capability | Quittal | Doing it manually |
|---|---|---|
| Hand-keying receipts | No | Yes |
| Auto-categorise to budget lines | Yes | No |
| Email chasing for approvals | No | Yes |
| Drafted narrative grounded in evidence | Yes | No |
| Built-in funder-format export | Yes | No |
| Reviewer + approver workflow | Yes | Partial |
| Submission-ready audit pack | Yes | No |
| Time per grant | 1–2 hours | 12+ hours |
Why teams choose Quittal
The simple, trustworthy way to report on any grant.
Reclaim your evenings
Stop scheduling grant reports for after-hours and weekends. Most grants are submit-ready in a single sitting.
Fewer errors, not just faster
Manual processes leak typos and missing GST. Quittal validates as you go.
Consistent across grants
Every grant report follows the same structure, regardless of who in the team prepared it.
Easier handover
If your coordinator leaves mid-grant, the next person picks up where they left off — not from scratch.
Auditor friendly
Hand over a single link, not a folder of PDFs and a spreadsheet.
Free in beta
Report on your first grant in Quittal on us — no migration project required.
Typical time savings
Based on real customer workflows reporting on grants between $5k and $250k.
| Task | Doing it manually | With Quittal |
|---|---|---|
| Collecting & sorting evidence | 3 hours | 30 minutes |
| Writing the narrative | 4–6 hours | 30 minutes review |
| Final formatting & checks | 2 hours | Instant |
| Hours per grantSaves around 10 hours per grant report on average | 12+ | 1–2 |
Compliance improvements you can measure
The same evidence — but consistent, traceable and audit-ready.
No missed clauses
Quittal reads the funding agreement and checks your report covers every reporting requirement.
Evidence completeness checks
Flags receipts without ABNs, GST issues and unapproved variances before submission.
Consistent narrative quality
Drafted sections follow the funder's preferred structure — no more 'is this what they wanted?'
Submission log
A timestamped record of exactly what was submitted, by whom, and when.
Customer scenarios
Composite stories from teams currently in the beta.
"I used to block out two full days a quarter for grant reports. Now I block out an afternoon — and most of that is reviewing the draft."
"Manual reporting was the reason I avoided applying for more grants. Quittal removed that bottleneck completely."
"Our grant reports used to depend on one person remembering everything. Now the system remembers."
Frequently asked questions
Done with after-hours grant reports?
Let Quittal handle the busywork — so you can focus on the work that earned you the grant.